A calendar of released films leaves out projects that were never filmed and stages of work before a public announcement. These intervals must be reconstructed from dated documents, not attributed to a single cause.
An interval between releases is not a filming duration
The gap between two releases measures public events. It does not automatically show when a story was chosen, a screenplay was started or a collaborator joined the project. Nor can it be used as the filming duration. To put Kubrick’s career in order, it is useful to keep distinct conceptual columns for development, preparation, filming, post-production and the release of a completed film.
The Shining was released in 1980 and Full Metal Jacket in 1987. Those seven years do not amount to seven years of continuous filming on the second film. The AFI records an industry announcement in January 1984 and Michael Herr’s formal involvement in the screenplay in 1985. These are documented points within the interval, not a complete explanation of every month that passed after the previous release.
The distinction affects the language used. Saying that a project was announced on a particular date does not mean that its cast, budget and screenplay had all been settled by then. Plans can change. The document establishes that there was a public expectation, while other sources are needed to describe the actual state of preparation and the decisions that followed.
The label of perfectionism does not fill those gaps by itself either. It can draw attention to revision and testing, but it does not identify what work was done in a particular period. Attributing all the years to retaking shots conflates different stages and introduces an activity that may not yet have begun. An explanation should start from dated evidence, not from a general characteristic attributed to the director.
Investigated projects that did not result in a Kubrick film
Napoleon is an example of activity that a list of releases leaves out. The archive catalogues research and preparation materials dating from around 1968, including records of historical enquiries and studies for a possible film. The documentation for the Napoleon project makes it possible to distinguish the extent of the preparation from the existence of a filmed work, which was never made under Kubrick’s direction.
A November 1968 document on future productions includes Napoleon. Its value lies in recording a plan at a particular point in the industry. It does not certify that the plans were carried out. Likewise, a location that was studied or an actor who was considered documents possibilities; neither should be turned into filmed scenes or a final contract without further evidence.
The catalogue for Aryan Papers dates materials from 1991 to 1993 and describes research, screenplays, budgets and planning related to the adaptation of Louis Begley’s Wartime Lies. The preparation of Aryan Papers accounts for a documented part of the years after Full Metal Jacket. This activity is distinct from filming Eyes Wide Shut, even though both fall within the same long interval between releases.
It is not right to add together the full duration attributed to each project as if they were exclusive, consecutive blocks. Dates on a folder may refer to documents produced at different times. Research may resume and may coincide with other enquiries. A chronology needs to preserve that possibility rather than manufacture a day-by-day schedule that the available sources do not provide.
The development of A.I. also introduces a project whose eventual realisation was directed by Steven Spielberg, not Kubrick. That distinction in authorship must be maintained when setting out the years of work. The existence of materials developed by Kubrick does not turn a later film directed by someone else into one of his releases, nor does it allow all the decisions behind the finished version to be attributed to him automatically.
Dating tasks, preserving gaps and distinguishing their outcomes
There is a twelve-year gap between the releases of Full Metal Jacket in 1987 and Eyes Wide Shut in 1999. Materials from different projects and documents relating to the preparation of the latter film can be placed within that period. The figure describes the interval, but explaining it depends on identifying which sources relate to each activity and how far they allow us to trace it.
The construction and location photographs catalogued for Eyes Wide Shut offer examples of specific tasks. Their dates may help establish that a space was being prepared, but not the total time spent conceiving the film. A record from 1996 or 1997 does not prove that all the work began then or that earlier stages involved no activity. It points to a verifiable event within a broader trajectory.
The work of directing and production includes decisions that do not always become visible in the finished film: assessing feasibility, reviewing proposals, keeping an idea or setting it aside. Describing these tasks does not require assuming that they were all equally lengthy. Nor does the quantity of surviving documents directly measure the time invested; preservation decisions and differences between types of material also play a part.
The agreements with studios and distributors add another temporal dimension. An announcement can set expectations that are later revised, and a release depends on more operations than completing the shoot. It is unwise to attribute any change in schedule to a single person’s wishes without identifying who was involved, what had been planned and which document records the change.
A responsible chronology can leave periods without a detailed description. That gap is not an invitation to fill them with rumours about obsessions, secret films or family decisions. It can also retain an approximate date when that is how the catalogue presents it. Precision means expressing the actual scope of the information, not replacing every uncertainty with an exact date.
Intervals become intelligible when projects, stages and outcomes are distinguished. A screenplay that has been worked on is not the same as a film that has been shot; a shelved project may have generated research; and a completed production still has a release history. This organisation makes it possible to recognise activity where the public calendar appears empty, while also avoiding the invention of a continuous explanation for years represented only by documented points.
Sources: American Film Institute, The Shining (1980) and Full Metal Jacket (1987); Stanley Kubrick Archive, UAL, SK/18/1/1 and SK/18/1/2, preparation and research for Napoleon; SK/18/1/1/3, Future Productions, November 1968; SK/18/2, Aryan Papers, 1991–1993; SK/17/2/3, location materials for Eyes Wide Shut; credits for A.I. Artificial Intelligence (2001).
View all articles in Career stages and professional autonomy
